Skytanking, one of the leading fuelling service providers in the aviation industry, is putting the world's first fully electric tanker truck in the 40 m³ class into operation at Stuttgart Airport. For the first time, the ground handling of an aircraft at STR can be carried out exclusively with electric vehicles.
-
2024
-
2023
the fairport means diversity and tolerance. For the first time, the terminal is lit up in rainbow colours on the occasion of the Christopher Street Day culture weeks. Oder alternativ: To celebrate the Christopher Street Day culture weeks, the terminal is lit up in rainbow colours for the first time.
Project start for the construction of a Hydrogen Aviation Center at Stuttgart Airport together with H2FLY, the Stuttgart-based company specialising in the development of hydrogen fuel cell systems for aircraft. Under the management of H2FLY, a central location with research and development infrastructure for companies and scientific institutes is to be created. It will provide the possibility to research, develop and test innovative concepts in the field of emission-free, hydrogen-electric aviation.
-
2022
Destination STRzero: Stuttgart Airport must invest around 2.4 billion euros by 2040 in order to achieve its ambitious climate targets. The airport is aiming to reach net zero in 2040 - 10 years earlier than originally planned and in accordance with the climate protection target of the state of Baden-Württemberg.
-
2021
The U6 tram to the new station Flughafen/Messe starts on 11 December. The airport is now also connected to the centre of Stuttgart by tram.
The visitor centre SkyLand opens in Terminal 3 with a view of the airport apron and interactive play stations to illustrate all things related to flying and Stuttgart Airport
On World Cleanup Day, Stuttgart Airport is inviting people to clean up together around the airport. More than 100 helpers take part on September 18, 2021, and collect cigarette butts, packaging waste, lost masks and other rubbish while walking in the area.
In March 2021, the project SmartFleet is launched at Stuttgart Airport. Germany's first tests of an autonomous baggage tug under real conditions start at STR.
-
2020
Cargo transports are in high demand all year round during the corona pandemic. As there are only a few passenger flights and therefore almost no opportunities for cargo on scheduled flights, passenger aircraft are sometimes used solely for cargo.
The world's first 4-seater hydrogen fuel cell aircraft Hy4 is ready for the next stage of development: the research team presents the latest generation of emission-free drive technology at Stuttgart Airport. Over the next 10 years, it is to be used in regional aircraft with up to 40 passengers.
Baden-Württemberg Climate Alliance: Flughafen Stuttgart GmbH enters into a partnership with the state for committed climate protection. STR is one of the first companies to join the alliance.
STR is the venue for musical events: the first "Live Summer 2020" festival takes place in car park P0, while the world's first 1:1 concerts at an airport are held in the empty Terminal 1.
The eastern part of the 3,345-metre-long runway receives a new surface from April to mid-June 2020. Due to the coronavirus pandemic, construction work on the partial renewal of the runway starts on 6 April, earlier than originally scheduled. Air traffic cannot take place during these preparatory works until 22 April. Construction phase I runs from then until 20 May. During this period, the shortened runway has a length of about 1,965 metres. In construction phase II, which lasts until 17 June, the runway measures 2,475 metres. On 18 June, the construction work is completed, and the runway is back to its original length.
In March, the corona crisis reaches Germany - Stuttgart Airport is also affected. Aircraft movements decline sharply. The focus shifts to night air mail, cargo, emergency and rescue flights in addition to the remaining scheduled traffic. Airlines park their planes on the apron of Stuttgart Airport, as a large part of their fleet is not needed. Restaurants and stores in the terminals close. Restrictions are not eased until June, and air traffic slowly picks up again. Nevertheless, even in the holiday month of August, passenger numbers and flight movements are only about one third of the previous year's figures.
-
2019
6 December
Stuttgart Airport welcomed its 12 millionth passenger on 6 December 2019. She travelled to Riga with airBaltic. For the first time, more than 12.7 million passengers took off and landed at Baden-Württemberg's state airport in just one year. Although the demand for air travel to and from Stuttgart increased until the end of 2019, the airport also succeeded in reducing its direct emissions by 33% since 1990. On the way to carbon neutrality, one third is accomplished.
The research aircraft SOFIA (Stratospheric Observatory for Infrared Astronomy) visits Stuttgart. The flying observatory is a joint project of NASA and the German Aerospace Center (DLR).
For the first time, the Children's Festival at Stuttgart Airport lasts two days to mark its 25th anniversary. Over 50,000 visitors attended the festivities on 10-11 August.
-
2018
For the first time, more than eleven million passengers took off and landed at Baden-Württemberg's state airport in just one year. Sabine Grieger from Öhningen set the record on the last day of November 2018. The airport management surprised her in the terminal. Dr. Arina Freitag and Walter Schoefer presented her with a Eurowings voucher and a large bouquet of flowers.
-
2017
With its 2016 report, Flughafen Stuttgart GmbH (FSG) struck out in a new direction: instead of a business report and a sustainability report, only one report will now be published every year. This shows that, in FSG's view, business success and sustainability performance are inextricably linked.
-
2016
After several years of construction work, the new office building, the SkyLoop, was handed over to the main tenant EY (Ernst & Young). Shortly thereafter, Flughafen Stuttgart GmbH’s head office moved into the newly built SkyPort building and on 11th April, the Stuttgart Airport Bus Terminal (SAB) was put into operation.
-
2014
15 July
Stuttgart Airport was named the Manfred Rommel Airport. This was done to honour the work of the long-time Chairman of the Supervisory Board and Lord Mayor of Stuttgart: Manfred Rommel (born 1928 – died 2013).
-
2013
In the winter of this year, the new combined heat and power plant started running.
-
2011
In July 2011, work to demolish the old freight yard began. The same month saw the opening of the fairport STR environmental tour, where visitors receive in-depth information on environmental protection at the airport at various stops along the way. Current information on sustainability issues can be found on the airport website.
- 2010
-
2009
The solar energy plant on the roof of the Bosch multi-storey car park has been producing around 1.2 million kW hours of electricity every year since 2009.
- 2007
- 2004
- 2000
-
1996
In 1996, the new runway, which was extended to 3,345 metres, was put into operation – making Stuttgart Airport able to handle larger and heavier aircraft.
From left to right: Hermann Schaufler (Minister of Transport and the Environment Baden-Württemberg), Dieter Kaden (CEO of Deutsche Flugsicherung GmbH [German Air Navigation Services]), Georg Fongern (Speaker of Vereinigung Cockpit), Prof. Klaus Wedekind (Managing Director of the Airport) and Manfred Rommel (Mayor of Stuttgart) blowing out the Red Lantern at the opening ceremony.
- 1994
- 1991
- 1987
- 1986
- 1972
- 1970
- 1969
- 1961
- 1958
- 1957
- 1955
- 1954
-
1949
In 1949, Flughafen Württemberg AG became Flughafen Württemberg GmbH. Its shareholders were the city of Stuttgart and the federal state.
- 1948
-
1945
20 January
The camp is shut down due to epidemic typhus. The prisoners are transferred to other camps. A total of 600 prisoners were detained in the subcamp in Echterdingen for over 3 months, of whom 119 died.
Text source: Filderstädter Schriftenreihe Band 20 zum KZ-AußenlagerStuttgart Airport and all of its employees deeply regret that during the Nazi era people were forced to work on the airport grounds under cruel conditions.
-
1944
A subcamp for the concentration camp Natzweiler-Struthof is set up in a hangar on the airport grounds. The prisoners are put to work on the site and in the surrounding area. On site, this includes repairing and cleaning the runway after low-flying aircraft attacks as well as building camouflage shelters for airplanes. The working conditions for the forced labourers are inhumane – there is a lack of food, medicine and heating.
Text source: Filderstädter Schriftenreihe Band 20 zum KZ-Außenlager -
1942
From 1942 on multiple bombings destroy parts of the airport. After a major attack in December 1944, the runway is no longer usable.
-
1941
From 1941 on foreign and forced labourers arrive on the airport grounds, where they work during World War II.
Text source: Filderstädter Schriftenreihe Band 20 zum KZ-Außenlager - 1939
-
1937
The foundation stone for Stuttgart Airport is laid on the Filder Plain. German forced labourers are also involved in the construction of the airport. The first aircraft, a Messerschmitt M 108 “Typhoon” lands while construction work is still going on.
Text source: Filderstädter Schriftenreihe Band 20 zum KZ-Außenlager -
1936
Luwag became Flughafen Württemberg AG in 1936.
- 1930
- 1925
-
1924
15 November
With the aim of building a new airport in Böblingen, Luftverkehr Württemberg AG, or 'Luwag' for short, was founded on 15 November 1924. It was the origin of today's airport operator at the current location: Stuttgart Airport.